PROBLEM: Upon moving into their new office in one of Yardley's historic buildings, Milestone Behavioral Health encountered problems with their air conditioning system. The existing high-velocity system was installed improperly, with several shortcuts leading to uneven airflow and overall discomfort.
SOLUTION: ECI Comfort expertly installed two high-velocity systems. This involved upgrading the trunk from seven inches to nine inches, adding 10 outlets, and adding insulation. As a result, the system now operates quietly, provides even cooling, and significantly improves dehumidification throughout the entire building.